<img alt="" src="https://www.365operation.com/807202.png" style="display:none;">

Concrete Mix Plant Boosts Output With Maxi-Tuff Elevator Buckets

21/04/2025

The Lampy Ready Mix plant at Elbow Lake, Minn., produces more than 7,500 cubic yards of concrete annually. Rugged, lightweight Maxi-Tuff buckets solved belt and bucket breakage problems for Lampy’s sand and aggregate elevator.