Case Studies - Maxi Lift

Concrete Mix Plant Boosts Output With Maxi-Tuff Elevator Buckets

Written by Maxi-Lift, Inc. | Apr 21, 2025 2:38:52 PM

The Lampy Ready Mix plant at Elbow Lake, Minn., produces more than 7,500 cubic yards of concrete annually. Rugged, lightweight Maxi-Tuff buckets solved belt and bucket breakage problems for Lampy’s sand and aggregate elevator.